End In Sight?

11Jul07

Don’t think they’re going to make completion in the next two days but things are moving on. Next week maybe? All the lighting on the inside has been fitted; outside lights still to go in. Power points are in as well; just the sub-board to wire up and cabling to go to the garage and sewage treatment unit. Sinks, basins, lavatory pans and extractor fans have been delivered as well. A welder was busy securing the balustrade rail and a start was being made on laying the timber floating floor. Work has started on the ducted heat pump as well.

  1. Second bedroom with wall lights for reading
  2. Wall light in main bedroom
  3. Kitchen through to living room
  4. Roughed in section of timber flooring
  5. Hall cupboards
  6. Garage looking south
  7. Garage looking east

1.  Second bedroom electric fittings  2. Main bedroom - wall light

3.  Kitchen through to living room 4. Timber flooring - roughing in

5.  Hall cupboards

 6. Looking south to the completed garage  7. Looking east over the top of the garage

Advertisement


Follow

Get every new post delivered to your Inbox.