Fit Out Start

29Apr07

We are very much at the stage of being utterly tired of building, as yet another ‘firm’ date for completion slides by without a hint of concern. On the up side, fit out has started, now that the plastering has finished (almost: they missed a bit in the cloakroom) and the painter has been through with the first coat of paint on the walls and ceiling. All the carcases for the joinery have been made and are in the process of being installed. Still to go in are the vanity units and the kitchen joinery. There’s still a way to go: tiling, hang internal doors and cupboard doors, install lights and power sockets, plumb in the sinks, shower, lavatories, lay the timber floor,  install architraves and skirting boards, finish painting and install heating.

  1. Hall cupboard in place
  2. Kitchen joinery carcases ready to go in
  3. Shower base in preparation
  4. Skirting boards going down

1. Hall cupboard carcase  2. Kitchen joinery

3. Shower base preparation  4. Skirting boards

Advertisement


Follow

Get every new post delivered to your Inbox.